EUVIMEDEUVIMED entdecken
CrossrefInfokarte

Focusing on Demand Side Management in the Future of the Electric Grid

Steven D. Czajkowski

Pittsburgh Journal of Environmental and Public Health Law · 2010

DOI: 10.5195/pjephl.2010.19 ↗
AbstractBibliografische Angaben

Abstract

The widespread blackout that occurred on August 14, 2003 (“the blackout”) exposed the weaknesses of the current electric transmission grid structure, and underscored the need for improvements to the transmission grid in the United States. The outage knocked out power to approximately fifty million people in Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut, New Jersey and the Canadian province of Ontario. 1 The total cost in the United States was estimated to be between $4 and $10 billion.

Wissen, das zu Ihrer Arbeit passt.

Vom kostenlosen Einstieg über die persönliche Recherche bis zur vollständigen Research Suite.

Tarife ansehen →

Sind alle Verlagsvolltexte enthalten?

Nein. Bibliografische Nachweise, Abstracts und Volltexte sind unterschiedliche Inhalte. Ob ein Volltext verfügbar ist, hängt von der Quelle, Open Access und Ihren vorhandenen Lizenzen ab. Ein EUVIMED-Tarif ersetzt keine zusätzlichen Verlagsrechte.

Tarife ansehen →