EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Uncertainty-aware possibilistic load forecasting for smart grid energy conservation

Asokan Vasudevan, Yogeesh Nijalingappa, Ali Khwaldeh, Poornachandran William, Koyel Roy, Suleiman Ibrahim Mohammad

Clean Energy Science and Technology · 13.11.2026

DOI: 10.18686/cest953 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Clean Energy Science and Technology, online erschienen am 13.11.2026. Verfasst von Asokan Vasudevan und 5 weiteren Autor:innen. Die Arbeit nennt 29 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Overview efficient electricity usage management in the presence of deep uncertainty is critical for modern power systems with a high renewable share. We present a fuzzy interval regression framework that represents load observations as triangular fuzzy numbers and estimates α-cut interval forecasts without requiring a full probability distribution. The original eight-hour example is retained only as a transparent calculation: at α = 0.5, the corrected two-weight fit gives an in-sample empirical coverage of 83.3% and a mean interval width of 2.164 MW; these values are descriptive and are neither confidence levels nor predictive validation. To provide out-of-sample evidence, the method was additionally evaluated on the public Taylor half-hourly electricity-demand series for England and Wales (4,032 observations), using the first 3,360 points for estimation and the final 672 points for testing. For the one-step model, the mean absolute error (MAE) was 429.1 MW, the root mean square error (RMSE) was 574.5 MW, and the mean absolute percentage error (MAPE) was 1.45%. The residual-calibrated, time-of-day triangular spreads had an empirical coverage of 91.7% at α = 0.5 and a mean interval width of 1,804.4 MW. An example of demand-response data is given in the form of a 1 MW effort to reduce base load at four defined hours. Assuming a marginal rate of 0.7 tCO₂/MWh, this gross avoided emission would correspond to an estimate of 2.8 tCO₂ not a quantifiable system benefit measurement. The findings favour interpretability and low computational complexity, but practical deployment requires calibrated margins; energy-neutrality or rebound constraints; larger multi-zone trials; and more specific marginal-emission data.

Zitieren

APA

Vasudevan, A., Nijalingappa, Y., Khwaldeh, A., William, P., Roy, K., & Mohammad, S. I. (2026). Uncertainty-aware possibilistic load forecasting for smart grid energy conservation. Clean Energy Science and Technology. https://doi.org/10.18686/cest953

Vancouver

Vasudevan A, Nijalingappa Y, Khwaldeh A, William P, Roy K, Mohammad SI. Uncertainty-aware possibilistic load forecasting for smart grid energy conservation. Clean Energy Science and Technology. 2026. doi:10.18686/cest953

BibTeX
@article{Vasudevan2026,
  author = {Vasudevan, Asokan and Nijalingappa, Yogeesh and Khwaldeh, Ali and William, Poornachandran and Roy, Koyel and Mohammad, Suleiman Ibrahim},
  title = {Uncertainty-aware possibilistic load forecasting for smart grid energy conservation},
  journal = {Clean Energy Science and Technology},
  year = {2026},
  doi = {10.18686/cest953}
}
Kostenlos starten →